What We Source

What We Source

From the slab up — and every surface. between.

A partial list of categories Domani procures at scale. If you don’t see it here, ask — we probably already have a supplier. Every category below is sourced factory-direct from our global network across 15+ countries.

Flooring

01
LVT, engineered hardwood, porcelain and ceramic tile, modular carpet, stairwell systems, waterproof plank.

Lighting

02

Decorative and architectural fixtures, exterior and landscape lighting, strip and cove, custom chandeliers.

Plumbing & Faucets

03

Kitchen and bath faucets, shower systems, tubs, vanities, toilets, grab bars, and bath accessories.

Millwork & Cabinetry

04

Kitchen cabinets, vanities, lobby and amenity millwork, built-ins, paneling, and custom casework.

Furniture & Casegoods

05

Guest room packages, amenity and lobby seating, beds and headboards, desks, casegoods, outdoor lines.

Appliances

06

Full residential and commercial packages — ranges, refrigeration, dishwashers, laundry, ventilation.

Wall Coverings

07

Wallpaper, vinyl wallcovering, acoustic panels, wall protection, murals, and digital print.

Hardware & Access

08

Door hardware, locksets, access control, bath hardware, window treatments, and drapery.

Décor & Art

09

Framed art, mirrors, rugs, accessories, and curated model-unit and common-area packages.

Our Process

A six-step workflow, refined over hundreds of projects.

Transparent pricing, fixed payment schedule, and defined quality control at every handoff. Engage us for the whole arc or any stage of it.
Step 01
1–2 weeks

Plan Review & VE

We review your architectural drawings, FF&E specs, and shop drawings. We flag cost-saving substitutions, consolidation opportunities, and spec risks — and deliver a written VE summary.

Step 02
2–3 weeks

Quote & Samples

Using our factory-direct network, we return line-item pricing and request physical samples for client and architect approval. You see real product, not renderings.

Step 03
1 week

Order & 50% Deposit

Once specs are locked, we issue purchase orders and collect a 50% deposit, which funds the production schedule. Payment schedule is fully transparent.

Step 04
8–14 weeks

Manufacturing

Production runs at vetted factories with regular progress reporting. For custom work, we conduct pre-production and mid-production inspections.

Step 05
1 week

Final Payment & QC

Before shipment, our QC team conducts a final inspection. Remaining 50% is released, and goods are crated and prepared for freight.

Step 06
4–12 weeks

Logistics & Install

Ocean or air freight, customs clearance, domestic transport, warehousing if required, and jobsite delivery coordinated to your construction schedule. Install supervision available.

Send Us the Drawings

Have a spec book from your architect or designer?

Upload the drawing set, FF&E schedule, or finish spec — we’ll come back with a line-item quote and a value-engineering pass within two weeks. No obligation, no markup on the look.